an incinerator for food waste and also polythene waste management

an incinerator for food waste and polythene waste administration. as per our requirements we would such as the YD 15C tiny incinerator.Mixed Biomedical waste Incinerator.Contract duration: To be made a decision by the supplier
Settlement terms:100% prepayment through financial institution TT after signing of agreement.

Please verify your determination to execute this contract task by sending out pamphlet and also your price quotation for the below spec to enable us submit it to the company incharge of the contract for their study and also approval.

Kind Of Waste: Mixed Biomedical waste.THE INCINERATOR AS REQUESTED BY OUR CLIENT SHALL BE SEMI AUTOMATIC WITH:
WASTE BUCKET/TANK – – ABOUT 2000KG
ABILITY OF FEEDING: REGARDING 600-800Kg Each Time.
MELTING AT ABOUT 150/165 -200 IN 60MINS
THE BURNER SHALL USAGE DIESEL/OIL
WITH CHIMNEY, ELECTRIC PANNELS, ELECTRIC MOTORS, And So On
. PRODUCTS FOR DISPOSAL: SHARP MEDICAL WASTES.

1. Waste burning ability of unit: 100-125 kgs/ human resources.
2. Mode of waste handling: Autoloading– DFDV + Bucket elevator
3. Kind of gas: LDO/ HSD
4. Sort of Heater procedure: Automatic
5. Anticipated fuel consumption: 30-35 kgs/hr **( depending upon general
mix of the waste, dampness
content, etc.) after preheat.
6. Connected electrical lots: Approximate. 7-8 KW (A/C 3 stage,220 V, 50 Hz).
7. Overall room demand: 9 m (L) X 8 m (W) X 6 m (H) Each unit
without stack

Burners temperature level regulated (TIC– Thermocouple) and also deal with ON–.
OFF basis. The regularity on ON– OFF will depend upon the nature of.
waste, wetness web content, calorific worth, and so on as well as will differ from waste to.
waste. The gas usage likewise depends upon the frequency of the door.
opening up as well as technique of operation of the incinerator. We have actually mentioned.
approx. anticipated fuel usage figures.

The Incineration System comprises of:

I. Main Incinerator with.
A. Primary & & Additional Chamber Modules appropriately refractory lined, piped & & wired.
B. Container lift + DFDV device for autoloading and also Deashing.
device.
II i. 1 No. totally automated Gas Oil burner for primary chamber.
ii. 1 No. fully automatic Fuel Oil heater for additional chamber.
III. Centrifugal forced draft follower setting up complete with motor drive, duct and also.
dampers, and so on installed on the typical skid of the device to offer:.
Burning air.

Eductor air.
IV. Eductor Setting up for:.
Air conditioning of exhaust gases from 900– 1000 0 C to around 350 0 C.
Maintaining the entire system under adverse stress to stay clear of hot gases/ dust.
bits rushing out of billing door.
V. Electric Control Panel together with safety and securities, and also Sound/ Visual.
signs and.
/ or alarms for efficient and also risk-free procedure of the system.
VI. Electric electrical wiring of the device.
VII. Oil storage tank of 1000 ltrs ability mounted on the skid.
VIII. Operating tools and takes on consisting of– rake, hoe, shovel (I No. each).
IX. Smokeshaft of 2.5 Mtr elevation.