Hospital Waste Management

Hospital Waste Management as well as Competitive prices as Pakistan is a competitive market. We have a complete setup with Office, Customer Relations, Import / Export, Biomedical Department, Application Support Department & Project Designing Department.Description        Minimum Requirements
Design standard    Multiple chamber incinerator to the design of EPA  standards, Air pollution control
Description of the Chimney    Top mounted, self supporting
Incinerator performance    150kg/hr
Refuse     Hospital waste and carcasses
Recommended Temperatures    Minimum 1000⁰C
Dimensions:
Length
Width
Height
Extra width for burners    At least 3000mm
Loading door opening    Minimum 700mm x 600mm
Hearth area    5.00square meters
Description or grate/hearth    A full hearth supplied to prevent contaminated liquids from flowing into the ash pit without being incinerated
Primary chamber volume    At least 3 cubic meters
Mixing chamber volume    At least 1 cubic meters
Settling chamber volume    At least 3 cubic meters
Weight excluding chimney    15, 000kg at manufacture
Firing tools supplied    Hoe, Poker and rakeMaterial of construction    Case – 5mm mild steel.
Bracing – Heavy angle and channel.
Hearth – 1550⁰C castable general purpose high strength, high abrasion resistant monolithic refractory concrete.
Ashing door – High grade cast iron.
Loading door – 5mm mild steel lined with 1550⁰C castable  general purpose high strength, high abrasion resistant monolithic refractory concrete.
Refractory  concrete:
Alumina content of refractory
Refractory thickness
Minimum 49%
At least 127mm.
Insulation  to walls     1000⁰C Castable insulation
Chimney stack:
Chimney
Height from base    3.5 mm mild steel
9 meters above ground level and clear the highest point of the building by not less than 3 meters
At least 560mm
At least 750Kg
Controls:
Draught

Air supply

Electric

Barometric indicator, door operated draught limiter

Built-in forced heated air ducts, primary and secondary (intensifier)
Control panel – Circuit breakers, main switch, timer, pilot lights, 2 set point pyrometer and one set point pyrometer.
Electricity supply required    415 Volts Three phase.
Auxiliary  fuel    Electrically operated only
Emission     Multiple chamber design with inbuilt emission control
Paint: Case and stack    400⁰C Heat Resistant Grey
Temperature of case    100⁰C