Category: manufacturer

incinerators 150 kg per hour

combustion chamber and one flue gas afterburning chamber. The incinerator must be able to meet the following parameters:   1.Treatment capacity of: a) 50 kg waste per hour.   2.Temperature: Main combustion chamber up to 850°C, and in the second chamber > = 1,100 °C   3.Retention Time: 2 seconds in the second chamber  

Read More
incinerators 300 kg per hour

Manual autoclave with vertical loading; gravity displacement type with possibility for Vacuum.   Capacity:      Up to 12 kg/h   Chamber size:      >150 liters   Material:       Stainless steel   Temperature:       134 °C   Further information:   Minimum autoclave chamber size shall be 150 liters and shall have a usable volume (loading basket) of 100 liters. Shall

Read More
20kgs per hour incinerator

The manufacturer must provide a declaration that the pressure vessel is manufactured in accordance with relevant guidelines for pressure equipment.   Following accompanying documents should be supplied with the treatment system and shall be available at the Site:   1.Operation instructions (including process description). 2.Loading and maintenance procedures. 3.Short-form of operation and loading procedures. 4.P&I

Read More
china medical waste incinerator

Incinerate: medical waste and general waste Capacity to burn waste: 400 — 500 kg/hr Fuel: Diesel Fuel Consumption: 10 litres/hr maximum Incineration temperature: 950 – 1300 °c Casing: thick (min 5 mm) Stainless steel casing and fully insulated to withstand sea humidity Voltage: 220/240 V or 380/415V Frequency: 50 Hz Feeding: automatic Ash 1 leftovers

Read More
Required Specifications for Mobile Incinerator

Operational Capabilities   PROCESS MINIMUM 1 TON PER DAY OPERATED WITH LIMITED TRAINING REGULAR MAINTENANCE CAN BE COMPLETED WITH LIMITED TRAINING COMPLIES WITH EURO / OR US-EPA EMISSION STANDARDS ABILITY TO BURN WASTE LUBRICANTS (POL) HANDLE ORGANIC SOLIDS (TO INCLUDE RMW) DEPLOYABLE MOBILE 24 HRS OF CONTINUOUS USE AUTOMATIC LOADING SYSTEM AUTOMATED ASH REMOVAL SYSTEM

Read More
small capacity incinerators

Capacité destructive de 55 Kg/h jour de déchets hospitaliers  avec un p?.c. i jusqu’à 3.200 Kcal/Kg 1)Type de déchet hospitalier 2)Pouvoir calorifique inférieur                                                                        3.200 kcal/kg 3)Humidité                                                                                                          20% 4)Teneur  en cendres et/ou inertes                                                                       8% 5)Capacité destructive nominale                                                                         55 kg/h 6)Volume chambre de combustion                                                                     1,65 m3 7)Volume chambre postcombustion                                                                   2.1 m3 8)Temps  transit des fumées en post

Read More
CLINICAL BIOLOGICAL WASTE BURNER

It must be a 3 chambered burner The loads ability of 250 kg The realty for the incinerator requirement to be able to stand up to the temperatures and additionally different other useful demands. The smokeshaft should certainly have a solid refractory cellular lining of special type of concrete to stand up to temperature degrees

Read More
waste incinerator manufacturers china

5-1- Chambre de post combustion est installée au dessus du foyer  de combustion , elle  est constituée d’un cylindre  métallique  revêtu intérieurement d’une couche d’ isolant et d’une couche de matériaux réfractaires. 5-2- Volume intérieur?: 2,1 m3 Est dimensionnée pour pouvoir  garantir  un temps de fumée de 2 secondes à 1100°C avec un pourcentage d’oxygène

Read More
incinerators for sale from china

Incinerators used will be limited to daylight hours of operation. This includes shutdown, cleaning and maintenance.   Waste streams shall not be mixed during the incineration process and the ash collection chamber will be cleaned when a different waste stream is to be incinerated. The Company will provide the contractor with a list of items

Read More
medical incinerator primary combustion price

Equipped with main combustion  chamber and a second chamber  for reburning  designed to ensure  complete combustion  of the gases  resulting  from  incomplete  combustion  of inert gases in the chimney, within the standards recommended  by the World Health Organization;   Equipped with temperature controller to adjust the air of the combustion of the waste, and fuel

Read More