Small Hospital Incinerators

Basic Info. Export Markets:Global Additional Info. Trademark:clover Origin:Nanjing Clover Product Description Nanjing Clover Medical Technology Co., Ltd. Is a leading waste incinerator manufacturer in China. We are local manufacturer and one of the largest exporter of China. Pyrolytic incinerator equipment technical is main waste treatment all of the world, for Medical Waste, Animal Incineration, medical

Read More
Bacteria Incinerator

Basic Info. Pullution Sources:Solid Waste Processing Processing Methods:Combustion Export Markets:Global Additional Info. Trademark:clover Product Description We, Nanjing Clover Medical Technology Co., Ltd., based at China mainland. We are manufacturer of environmental protection equipment and specialized in design, incinerator 30 kg/hr, incinerator 300kg capacity price, incinerator 50kg, incinerator 50kg per hour, incinerator animal hospital, incinerator bank

Read More
Pathalogical Incinerator

Basic Info. Export Markets:Global Additional Info. Trademark:clover Product Description Company License No.,: 320105000138343  Taxation Certificate No.: 320105571573734  Export Business Certificate No.: 3201571573734  Nanjing Clover Medical Technology Co., Ltd. Is a leading waste incinerator manufacturer in China. The factory workshop local in liuhe Economic Development Zone, suburb of Nanjing and business office local in downtown area.

Read More
Waste Incineration Equipment

Basic Info. Export Markets:Global Additional Info. Trademark:CLOVER Origin:Pr China Production Capacity:1000 Sets Per Year Product Description 2. Regarding Shipping Insurance – One case from Macau, SAR — Sept. 5, 2011  In year 2011, one Macau (China) place an order of incinerator, model SYC-30. This order under CIF business term and the carton ship via Hongkong

Read More
Incinerateur

Basic Info. Export Markets:Global Additional Info. Trademark:clover Origin:China Production Capacity:1000 Sets Per Year Product Description Key Features:  * All models with Dual combustion chamber.  * Stainless Steel chimney/stack, long lifetime. *according to order  * High temperature, long lifetime of incinerator.  * Free or minimum installation on site.  * High burn rate, from 10kgs to 500kgs

Read More
Incinerator A4000

Basic Info. Model NO.:A4000 Pullution Sources:Solid Waste Processing Processing Methods:Combustion Export Markets:Global Additional Info. Trademark:CLOVER Product Description Nanjing Clover Medical Technology Co., Ltd. Is a leading waste incinerator manufacturer in China. We are local manufacturer and one of the largest exporter of China. Pyrolytic incinerator equipment technical is main waste treatment all of the world,

Read More
Waste Incinerators

Basic Info. Export Markets:Global Additional Info. Trademark:CLOVER Origin:China Production Capacity:1000 Sets Per Year Product Description First, we are one manufacturer in China. We are in this field from year 2005 and at that time, we make trading business to oversea. Under support of our customer, like our agent in Egypt, Mr. Ibrahim, solid waste incinerator

Read More
Abandoned Object Incinerator

Basic Info. Export Markets:Global Additional Info. Trademark:clover Product Description Incinerator is a incineration equipment, direct fire waste by gas fuel or oi fuel. As different circumscription, incinerator can be named many words as below:  Treatment capacity: Small scale incinerator, large scale incinerator and incineration pant.  Waste material: Municipal waste incinerator, medical waste incinerator, animal cremation

Read More
Melt blown Production Line 400mm and 1600mm and ES Fiber Production Line and N95 Mask Machine and Disposable Mask Machine

1. N95 and Disposable Mask Machine   2. 400mm and 1600mm Melt blown Production Line 3. ES Fiber Production Line       N95 Face Mask Machine Production Line Melt blown Production Line   A.)Optional Capacity: 1600mm Efficiency: 95-97% FOB Term Price: USD per set Price Valid: 5days. Ave.60 Days ready for shipping. In stock

Read More
New Courtice incinerator hits further delays

CLARINGTON — Clarington’s new energy-from-waste facility will be delayed a second time because the boilers aren’t operating properly and the ongoing startup period could cost Durham Region an extra $1 million. “I’d rather see it delayed and done right than rushed,” said Clarington Mayor Adrian Foster. The Durham York Energy Centre facility, located in Courtice,

Read More