Operating period Anticipated daily period 8 hours

Maximum operating period 12hours

Chamber

Should be refractory lined to the following standards, hearth and lower section of chamber walls.

Hot face materials

Super dusty firebricks

Limiting continuous service limit 1500°c

Thickness 100mm

Thermal conductivity 1.3W/mk

Insulation

Calcium silicate

Limiting continuous service limit 1000°c

Thickness 25mm

Thermal conductivity 0.095w/mk

Chimney/stack

Should be manufactured from refractory lined mild steel or high quality air cooled stainless steel. The chimney/stack should have a minimum height of 10 meters above ground level

Ignition burners

Fully packed oil type complete with electric ignition and flame failure controls wired with continuous running fan and complete with all valves, fan and motor

Maximum rating :               at least 450kw/hour

Burner:                                  arranged for on/off operation

Maximum consumption :   at least 6litres per hour

Average consumption :      at least 3litres/hour

After burner

Fully packed oil type complete with electric ignition and flame failure controls wired with continuous running fan and complete with all valves fan and motor.

Maximum rating :     At least 450kw/hour

Burner:                        arranged for on/off operation

Maximum consumption:     at least 9 litres/hour

Average consumption:         at least 4.5 litres /hour

Flue gas treatment

Should have particulate remover (scrubbers)

Electrical supply

Single phase 220/240v a.c,50/60hz

Documentation

Operation manual   2 sets

Service /maintenance manual 2 sets