Medical Waste Incinerator Purpose

For a complete destruction of waste from various hospital services by heat treatment of high temperature in accordance with EU standard on emission requirement.

-Waste from health care activities

-Infections waste, laboratory cultures, waste form operation room isolations material in contact with infected patients, waste potentially being infected by pathogenic agents. 

-Pathological waste, human fragments, blood, fetus, all body fluids, human tissues.

-Sculpts, needles, infusion sets, blades, glass

-Pharmaceutical waste. 

-Chemical waste laboratory reagents, disinfectants

-Expired drugs. 

-Low radiation radioactive element.

Medical waste incinerator: – Ecological Requirement

– No odor

-No fume

-Definitive treatment of waste

Medical waste incinerator: – Manufacturing Standards 

-UL,CE, ASME, ISA EURO emission standard 

1.Medical waste incinerator 

Construction – CS plate shells, FB reinforcement, cast refractory linings, 

                        Insulation and 14 gage aluminum jacket. 

Type of fuel – Oil fired (Diesel)

Burning Capacity – 250kg/hr and moisture up to 80%.

Duration -8-16/Continuous  

Average fuel consumption – Very little as much as possible

Control Type – PLC based operation

Operating Temperature – Primary chamber 800oc ± 50

                                     – Secondary Chamber 1050oc ± 50

Size of incinerator – Not more than 15mx7.20m

Chimney – Ø630x25meter height  and 7mm thick CS.

Combustion efficiency- 99%

Mode of waste handling- Semi-automatic via ram loader.

Mode of ash handling – Semi-automatic via grate and ash trolley.

Pollution control equipment- Dry settlement zone

Doors- 1-waste charging door in primary chamber

            1-clinker door in primary chamber

            1-ash trolley access door in primary chamber

            1-clean out door in secondary chamber

Burner – 2- ignition burner in primary chamber

               2- after burner in secondary chamber.

            Type- package mono block-fully automatic

Type of burner operation- modulation control

Forced draught fan- 1-primary air fan

                                1-secondary air fan

             

Fuel storage tank – Capacity- 2500liter above ground

                             – Material-6mm thick mild steel

                             – 2-diesel pump, gate valve, safety valve, strainer

                                Pipe, pressure gage, check valve, control board

                                Level indicator. Etc

Refractory/insulation thickness- not less than 225mm

Ram loader capacity- 0.75m3

Electrical supply- 380v/3ph/50 Hz

Finish and painting type- powder coated 

Audio/ visual alarm system- burner lockout, overload fault 

Electrical accessories- primary and secondary chamber temperature 

                                  Controller/indicator, auto controls, electrical 

                                  Control switches, push buttons, relays, contactors

                                  Thermocouples, burner sequence controllers,

                                  Timers, emergency stop and alarms.