Burn Rate * 60 Kg / hr

Ingredients to be burned Cotton, Rubber, PVC Sheets, PE Gloves, Oil, Plastic Bottles, Paper etc.

Chambers * Dual Chamber.

1: Primary Controlled Air

2: Secondary Excess Air

Temperature Monitoring Required

Temperature Control to Primary & Secondary Chambers Required

System Status & Alarms Required for all necessary parameters.

Fittings & Accessories Complete Package is required ( Including Nozzles & Flanges etc.)

Installation Requirements. As low as possible . Almost Plug & Play type.

Dimensional Sketch, Operation & Installation Manuals. Required

Off – Gas System Required

Heat Insulation Required for indoor installation

Delivery Karachi Sea Port – Pakistan

The details of Components of incinerator is as follows:

Component Name     Features              Range.

       Primary Chamber Temperature Required* 800 – 1000 deg C.

Heating Source Natural Gas

     Secondary Chamber Temperature * 1100 – 1300 deg. C

Heating Source Natural Gas + Propane or Fuel Oil as an additional source

Off – Gas Residence Time  2 Seconds.

  Refractory Material Material * Alumina ( 56 – 80 % Pure )

Lining * SS 316L

Life Span * 10 – 15 years.

Rating Temperature 1600 – 1800 deg. C

Media Slightly acidic

            Insulation Material Ceramic Fiber

Thickness 25 “ minimum

  Feeding & Ash Removing     System Air Tight ventilating locked doors ( Feeding from Top will be preferred)

 Spares Required for 5 Years trouble free operation