Pyrolytic Double Chamber Incinerator Small Size:Burning Rate:30-45 kg/hr;Maximum Load Capacity:400 kg
Items/Model
TS50(PLC)
Picture
Principle
Solid Waste Incineration
Burn Rate
30-45 kg/hour
Control Mode
PLC(Programmable Logic Controller Incinerator)
Combustion Chamber
560L
Internal Dimensions
100x80x70cm
Secondary Chamber
280L
Smoke Filter Chamber
Yes
Feed Mode
Manual
Voltage
220V
Oil Consumption (kg/hour)
Average 13.3
Gas Consumption (m3/hour)
***
Temperature Monitor
Digital Display
Temperature Protection
Yes
Oil Tank
800L
Feed Door
70x55cm
Chimney
5Meter
Chimney Type
Stainless Steel
1st. Chamber Temperature
800℃–-1000℃
2nd. Chamber Temperature
1000℃-1200℃
Residency Time
2.0 Sec.
Gross Weight
4500kg
External Dimensions
230x130x155cm
HICLOVER – Medical EnvironmentalWaste IncineratorsMedical Waste IncineratorPet Animal CremationSolid Waste Incinerator
Tel: +86-25-8461 0201Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com
Email: [email protected]
Email: [email protected]Nanjing Clover Medical Technology Co.,Ltd.2020-03-21

Medium Size:Burning Rate:60-80 kg/hr Pyrolytic Double Chamber Incinerator
Items/Model
TS100(PLC)
Picture
Principle
Waste Incineration Treatment
Burn Rate
60-80 kg/hour
Control Mode
PLC(Programmable Logic Controller Incinerator)
Combustion Chamber
1200L
Internal Dimensions
120x100x100cm
Secondary Chamber
600L
Smoke Filter Chamber
Yes(Dry Scrubber)
Feed Mode
Manual
Voltage
220V
Oil Consumption (kg/hour)
Average 20.4
Gas Consumption (m3/hour)
***
Temperature Monitor
Digital Display
Temperature Protection
Yes
Oil Tank
1100L
Feed Door
80x60cm
Chimney
10Meter
Chimney Type
Stainless Steel
1st. Chamber Temperature
800℃–-1000℃
2nd. Chamber Temperature
1000℃-1200℃
Residency Time
2.0 Sec.
Gross Weight
6000kg
External Dimensions
260x150x180cm
The requirement is for a pyrolytic double-chamber incinerator. The incinerator shall be capable of using dieselfuel as a supplemental fuel oil.It should incorporate an Air Pollution Control (APC) System suitable for basic emission control.The proposed incinerators shall be appropriate for critical harsh environmental conditions, suitable for rapiddeployment, and different climate zones (e.g. desert, tropical country, mountain, etc.) in which there are severalvariations of the relative natural forces (e.g. temperature, humidity, wind, etc.) for a minimum period of 10 yearsif the specified maintenance schedule is followed.The incinerators should be supplied assembled, whenever possible, and all parts and components should bepackaged on pallets in order to be transported via road, air (via helicopters or air-cargoes, e.g. MI8 or C130)and via sea in a 20’ ISO sea shipping containers.HICLOVER – Medical EnvironmentalWaste IncineratorsMedical Waste IncineratorPet Animal CremationSolid Waste Incinerator
Tel: +86-25-8461 0201Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com
Email: [email protected]
Email: [email protected]Nanjing Clover Medical Technology Co.,Ltd.2020-03-21
- dav
- dav

Large Size Burning Rate:150-200 kg/hr Solid Waste Equipment Primary and Secondary Combustion Chamber Incinerator
Items/Model
TS500(PLC)
Picture
Principle
Waste Incineration Treatment
Burn Rate
150-200 kg/hour
Control Mode
PLC(Programmable Logic Controller Incinerator)
Combustion Chamber
2700L
Internal Dimensions
190x120x120cm
Secondary Chamber
1300L
Smoke Filter Chamber
Yes
Feed Mode
Manual
Voltage
220V
Oil Consumption (kg/hour)
Average 28
Gas Consumption (m3/hour)
***
Temperature Monitor
Digital Display
Temperature Protection
Yes
Oil Tank
1400L
Feed Door
90x80cm
Chimney
10Meter
Chimney Type
Stainless Steel
1st. Chamber Temperature
800℃–-1000℃
2nd. Chamber Temperature
1000℃-1200℃
Residency Time
2.0 Sec.
Gross Weight
15000kg
External Dimensions
400x210x300cm(without chimney)
The air supply should be controlled efficiently;Flame contact with all the gases should be achieved;The minimum combustion temperature of the primary chamber should not be less than 850°C;The primary combustion chamber should be equipped with a means to provide supplemental liquid fuel supply.The primary chamber should be cold face refractory lining, with a minimum thickness 100 mm.The following conditions should be met in the secondary combustion chamber:The air supply should be controlled efficiently;Flame contact with all the gases should be achieved;The size of the secondary chamber should be properly designed to ensure that the gas retention time should not be less than 2 seconds;The secondary chamber should be cold face refractory lining, with a minimum thickness 100 mm;The chamber should incorporate an integrated combustion burner air fans with automatically controlled distribution;The gas temperature, as measured against the inside wall in the secondary chamber (not in the flame zone) should not be less than 1,100°C;HICLOVER – Medical EnvironmentalWaste IncineratorsMedical Waste IncineratorPet Animal CremationSolid Waste Incinerator
Tel: +86-25-8461 0201Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com
Email: [email protected]
Email: [email protected]Nanjing Clover Medical Technology Co.,Ltd.2020-03-21

hiclover incinerator 100-150kgs per hour
Model
YD-100
Picture
Burning Rate
100-150 kgs/hour
Primary Combustion Chamber
2000 Liters
Secondary Combustion Chamber
500 Liters
Feed Mode
Manual
Voltage
220V/380V
Power
2.5Kw
Fuel Type
Diesel Oil
Burner
Italy Original
Oil Consumption (Diesel Oil)
Average 28 kg/hour
Gas Consumption (Natural Gas)
***
Internal Dimensions
180x115x98 cm (primary chamber)
External Dimensions
270x185x280cm (without chimney)
Temperature Monitor
Yes
Oil Tank Capacity(if oil fuel)
200 Liters
Door Opening
55 x 80cm
Chimney Length
6.0 Meters
Chimney Type
Steel
Equipment Gross Weight
9000 kgs
Operation Technical Specifications
Primary Chamber Temperature
800℃–-1000℃
Secondary Chamber Temperature
1000℃-1200℃
Residency Time
2.0 Sec.
Burning Efficiency
>98%
Waste Lower Calorific Power
3500Kcal
Tel: +86-25-8461 0201
Website: www.hiclover.com
Email: [email protected]
Email: [email protected]
2020-03-22

Large General waste incinerator Burn Rate up to 250kg per hour
Items/Model
TS300(PLC)
Principle
Waste Incineration Treatment
Burn Rate
Average 250 kg/hour
Control Mode
PLC(Programmable Logic Controller Incinerator)
Combustion Chamber
2000L
Internal Dimensions
170x120x100cm
Secondary Chamber
1000L
Smoke Filter Chamber
Yes
Feed Mode
Manual
Voltage
220V
Power
2.5Kw
Oil Consumption (kg/hour)
Average 28(DO)
Gas Consumption (m3/hour)
***
Temperature Monitor
Digital Display
Temperature Protection
Yes
Oil Tank
1000L
Feed Door
80x60cm
Chimney
10Meter
Chimney Type
Stainless Steel
1st. Chamber Temperature
800℃–-1000℃
2nd. Chamber Temperature
1000℃-1200℃
Residency Time
2.0 Sec.
Gross Weight
11000kg
External Dimensions
400x210x300cm(without chimney)
Tel: +86-25-8461 0201
Website: www.hiclover.com
Email: [email protected]
Email: [email protected]
2020-03-22

Medical Waste Incinerator for Coronavirus Disease


3 Chambers Incinerator
Primary chamber:
Heavy duty mild steel casing, High quality Refractory lining and insulation 01 x natural gas ignition burners (automatic) 01 x temperature sensor points with complete internal fans.
Secondary Chamber:
Heavy duty mild steel casing, high quality refractory lining and insulation 01 x natural gas burners (automatic) with complete 01 internal fans. 02 Sec gas residence times.
Third Chamber:
Heavy duty mild steel casing, high quality refractory lining and insulation 01 x natural gas ignition burners (automatic) with complete internal fans. 02 Sec gas residence time.
Integrated dual flu gas washer:
Resultant gasses passed through dual gas filtration system for maximum clean emission. It is also equipped with chain filters.
Chimney:
Heavy duty 5mm or more stainless steel casing mild steel casing.
Stack cap/spark arrestors.
Control Panel:
a.Temperature Monitoring with 4 digit display.
b.Thermostat control device for burner (fuel saver)
c.Temperature control 0-12 hours.
d.Integral fan timer control

Supply, Installation and commissioning of Waste Incineration system
De manera atenta solicito me colabore con la cotizacion del incinerador incluyendo envió.Puri group a hospitality business in Indonesia is interested to introduce renewable energy in Indonesia or to use the energy sources for its facility around Indonesia. Kindly request to have more information on incinerator technology as it is needed to process 100 ton to 500 ton waste aday. In the Frame of our Specialized Projects Management, we are currently in search for supplier of Waste Incineration system for hazardous waste, the incineration system will be used for incineration of Prohibited Drugs and toxic materials, waste poultry, Dead Animals “cows, goats”, Spoiled vegetables, Etc. at customs Ports. For that we would like to request for your technical and Financial Proposal for supply , installation and Commissioning of Hazardous Waste Incineration system with incineration capacity of at least 400 Kg/ hr.
Page | 3
The proposal should include the complete description of the whole system: Total cost of supply, Installation, commissioning, Automatic feeding, automatic de- ashing during operation, and efficient gas cleaning system (wet, dry or high temperature ceramic filters), continuous emission monitoring system (CEMS), and all other accessories, Control panel for all components of the system, Troubleshooting alarm system covering all components of the system, to notify the operator for the fault that may arise during the operation, and to perform immediate corrective action, Emergency Stop button that can easily shut off / shut down all major part of the system in case of emergency situation. Primary chamber capacity/ Average capacity per patch Load: 3000 Kg, Incineration capacity per hour 400 Kg/hr., Loading system: side loading, Number of burners: minimum 7 burners, (5 for primary chamber, 2 for secondary chamber), Fuel: Diesel, The system should work continuously for at least 12 hours per day, The primary chamber: Heavy- duty anodized Rust resistant steel casing with minimum thickness 7mm. painted with heat reflective paint, internal heavy duty refractory cement lining and insulation for maximum heat retention. Cost of supply, installation, operation cost including fuel consumption per hour, and cost of other consumable materials treatment materials (consumption rate per hour and unit cost each), delivery time till operation, Layout for the whole three units and gas cleaning systems, considering minimum are required for the system “including enough area for operation and handling”, Confirmation letter that gas emission from the system after gas cleaning should comply with Saudi regulations for gas emissions (stamped letter and Emission comparison table showing the emissions from your system compared with Saudi regulations “attached”)
Page | 4
• Incinerator should have two (2) chambers: primary chamber with five (5) burners to incinerate materials and the secondary chamber with two (2) burners to incinerate exhaust gases.
• The main body of the incinerator shall be stainless steel and the outside insulation thickness of not less than 7 mm made from zinc or phosphate for temperature insulation
• The main gate of the Incinerator should be 150 mm thick and strength not less than 170 kg/m3. The door should be automatic with remote to operate.
• The Incinerator should be designed in accordance of the environmental regulation followed in country of origin or as per Saudi Arabian PME Regulations.
• The incinerator should have fuel storage with capacity of 1000 liter.
• The incinerator shall have the capacity to operate with temperature up to 1300 OC in the primary chamber and it can remove the residual while the incinerator is in operation
• The inside body of the incinerator should have insulation layer made of calcium with thickness of 50 mm while the thickness of the internal surface should be 100 mm in order to stand with 1300 OC.
• All the supporting braces of the incinerator shall be installed on stainless steel.
• The gap between the internal and external body shall be filled with the special insulation material.
• The exhaust shall not stay more than two (2) seconds in the secondary chamber and this chamber shall be built with high density of ceramic oasis.
• There should be a stack with four (4) meter from the top surface of the incinerator and can be removed and installed.
• The incinerator shall have control device for exhaust gases so that the emission shall meet the PME source standards
• The power supply should be 220 – 380 Volts, 60 Hz. and the incinerator shall be provided with control panel showing the following:
Page | 5
• Temperature of primary and secondary chamber.
• Condition of pressure gages.
• Alarm showing if there is any leakage or misconducting in the electricity.
• Indicator for overloading the burner.
• Timer for automatically switching off the incinerator.
• All the incinerator parts including fuel pumps, fans, valves and pipes can be operated in high ambient temperature (50OC)
• All parts of the incinerator shall be painted in one color which should be resistant to high humidity, high temperature and high dust / sandstorm.
• 3 years warranty with spare parts and technical supply and
• 10 years warranty for providing spare parts starting from the date of first warranty expiry
• Provide all the list of consumable items like, filters, sorbents, etc.
The bidder shall provide all necessary details related to the facility dimensions, space area required for the whole system and all operation requirements, Details about required facility (hanger) including Layout, civil work and electromechanical details including electricity, water pipes, fuel pipes, tanks, etc. Complete Drawing & 3D drawing Clearly Show All Sections and Details of the System. List of spare parts and checklist. Required Operation staff, Fuel consumption rate of the whole system. Since our project is a turnkey project including Design, Build & Operate of central incineration facility covering all the above mentioned details and we have to coordinate all civil works and necessary requirements to operate the system.