Tag: incinerator

Pyrolytic Double Chamber Incinerator Small Size:Burning Rate:30-45 kg/hr;Maximum Load Capacity:400 kg

Items/Model

TS50(PLC)

Picture

Principle

Solid Waste Incineration

Burn Rate

30-45 kg/hour

Control Mode

PLC(Programmable Logic Controller Incinerator)

Combustion Chamber

560L

Internal Dimensions

100x80x70cm

Secondary Chamber

280L

Smoke Filter Chamber

Yes

Feed Mode

Manual

Voltage

220V

Oil Consumption (kg/hour)

Average 13.3

Gas Consumption (m3/hour)

***

Temperature Monitor

Digital Display

Temperature Protection

Yes

Oil Tank

800L

Feed Door

70x55cm

Chimney

5Meter

Chimney Type

Stainless Steel

1st. Chamber Temperature

800–-1000

2nd. Chamber Temperature

1000-1200

Residency Time

2.0 Sec.

Gross Weight

4500kg

External Dimensions

230x130x155cm

HICLOVER – Medical Environmental 


 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

 

2020-03-21

Read More

Medium Size:Burning Rate:60-80 kg/hr Pyrolytic Double Chamber Incinerator

Items/Model

TS100(PLC)

Picture

Principle

Waste Incineration Treatment

Burn Rate

60-80 kg/hour

Control Mode

PLC(Programmable Logic Controller Incinerator)

Combustion Chamber

1200L

Internal Dimensions

120x100x100cm

Secondary Chamber

600L

Smoke Filter Chamber

Yes(Dry Scrubber)

Feed Mode

Manual

Voltage

220V

Oil Consumption (kg/hour)

Average 20.4

Gas Consumption (m3/hour)

***

Temperature Monitor

Digital Display

Temperature Protection

Yes

Oil Tank

1100L

Feed Door

80x60cm

Chimney

10Meter

Chimney Type

Stainless Steel

1st. Chamber Temperature

800–-1000

2nd. Chamber Temperature

1000-1200

Residency Time

2.0 Sec.

Gross Weight

6000kg

External Dimensions

260x150x180cm


The requirement is for a pyrolytic double-chamber incinerator. The incinerator shall be capable of using diesel 
fuel as a supplemental fuel oil.
It should incorporate an Air Pollution Control (APC) System suitable for basic emission control.
The proposed incinerators shall be appropriate for critical harsh environmental conditions, suitable for rapid 
deployment, and different climate zones (e.g. desert, tropical country, mountain, etc.) in which there are several 
variations of the relative natural forces (e.g. temperature, humidity, wind, etc.) for a minimum period of 10 years 
if the specified maintenance schedule is followed.
The incinerators should be supplied assembled, whenever possible, and all parts and components should be 
packaged on pallets in order to be transported via road, air (via helicopters or air-cargoes, e.g. MI8 or C130) 
and via sea in a 20’ ISO sea shipping containers.
HICLOVER – Medical Environmental 


 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

 

2020-03-21

Read More

Large Size Burning Rate:150-200 kg/hr Solid Waste Equipment Primary and Secondary Combustion Chamber Incinerator

Items/Model

TS500(PLC)

Picture

Principle

Waste Incineration Treatment

Burn Rate

150-200 kg/hour

Control Mode

PLC(Programmable Logic Controller Incinerator)

Combustion Chamber

2700L

Internal Dimensions

190x120x120cm

Secondary Chamber

1300L

Smoke Filter Chamber

Yes

Feed Mode

Manual

Voltage

220V

Oil Consumption (kg/hour)

Average 28

Gas Consumption (m3/hour)

***

Temperature Monitor

Digital Display

Temperature Protection

Yes

Oil Tank

1400L

Feed Door

90x80cm

Chimney

10Meter

Chimney Type

Stainless Steel

1st. Chamber Temperature

800–-1000

2nd. Chamber Temperature

1000-1200

Residency Time

2.0 Sec.

Gross Weight

15000kg

External Dimensions

400x210x300cm(without chimney)

The air supply should be controlled efficiently;
Flame contact with all the gases should be achieved;
The minimum combustion temperature of the primary chamber should not be less than 850°C;
The primary combustion chamber should be equipped with a means to provide supplemental liquid fuel supply.
The primary chamber should be cold face refractory lining, with a minimum thickness 100 mm.
The following conditions should be met in the secondary combustion chamber:
The air supply should be controlled efficiently;
Flame contact with all the gases should be achieved;
The size of the secondary chamber should be properly designed to ensure that the gas retention time should not be less than 2 seconds;
The secondary chamber should be cold face refractory lining, with a minimum thickness 100 mm;
The chamber should incorporate an integrated combustion burner air fans with automatically controlled distribution;
The gas temperature, as measured against the inside wall in the secondary chamber (not in the flame zone) should not be less than 1,100°C;
HICLOVER – Medical Environmental 


 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

 

2020-03-21

Read More

hiclover incinerator 100-150kgs per hour

Model

YD-100

Picture

Burning Rate

100-150 kgs/hour

Primary Combustion Chamber

2000 Liters

Secondary Combustion Chamber

500 Liters

Feed Mode

Manual

Voltage

220V/380V

Power

2.5Kw

Fuel Type

Diesel Oil

Burner

Italy Original

Oil Consumption (Diesel Oil)

Average 28 kg/hour

Gas Consumption (Natural Gas)

***

Internal Dimensions

180x115x98 cm (primary chamber)

External Dimensions

270x185x280cm (without chimney)

Temperature Monitor

Yes

Oil Tank Capacity(if oil fuel)

200 Liters

Door Opening

55 x 80cm

Chimney Length

6.0 Meters

Chimney Type

Steel

Equipment Gross Weight

9000 kgs

Operation Technical Specifications

Primary Chamber Temperature

800–-1000

Secondary Chamber Temperature

1000-1200

Residency Time

2.0 Sec.

Burning Efficiency

98%

Waste Lower Calorific Power

3500Kcal


HICLOVER – Medical Environmental 


 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

 

2020-03-22

Read More

Large General waste incinerator Burn Rate up to 250kg per hour

Items/Model

TS300(PLC)

Principle

Waste Incineration Treatment

Burn Rate

Average 250 kg/hour

Control Mode

PLC(Programmable Logic Controller Incinerator)

Combustion Chamber

2000L

Internal Dimensions

170x120x100cm

Secondary Chamber

1000L

Smoke Filter Chamber

Yes

Feed Mode

Manual

Voltage

220V

Power

2.5Kw

Oil Consumption (kg/hour)

Average 28(DO)

Gas Consumption (m3/hour)

***

Temperature Monitor

Digital Display

Temperature Protection

Yes

Oil Tank

1000L

Feed Door

80x60cm

Chimney

10Meter

Chimney Type

Stainless Steel

1st. Chamber Temperature

800–-1000

2nd. Chamber Temperature

1000-1200

Residency Time

2.0 Sec.

Gross Weight

11000kg

External Dimensions

400x210x300cm(without chimney)

HICLOVER – Medical Environmental 


 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

 

2020-03-22

Read More

Medical Waste Incinerator for Coronavirus Disease

Coronavirus Disease 2019 (COVID-19) pandemic continues all over the world, clinics,hospitals,goverment may need to consider on-site disposal for the infectious 

medical waste. The medical waste incinerators that has been effectively used to dispose of hazardous waste during 

viral outbreaks like Ebola. HICLOVER.COM reaches temperatures of up to 1200oC and is able to destroy health care waste 

for laboratories, small clinics, and hospitals treating patients of the Novel Coronavirus (COVID-19) such as linens, sharps, gauze, gowns, etc.

Clicky




Open chat








Read More

3 Chambers Incinerator

Primary chamber:
Heavy duty mild steel casing, High quality Refractory lining and insulation 01 x natural gas ignition burners (automatic)  01 x temperature sensor points with complete internal fans.
Secondary Chamber:
Heavy duty mild steel casing, high quality refractory lining and insulation 01 x natural gas burners (automatic) with complete 01 internal fans. 02 Sec gas residence times.
Third Chamber:
Heavy duty mild steel casing, high quality refractory lining and insulation 01 x natural gas ignition burners (automatic) with complete internal fans. 02 Sec gas residence time.
Integrated dual flu gas washer:

Resultant gasses passed through dual gas filtration system for maximum clean emission. It is also equipped with chain filters.
Chimney:
Heavy duty 5mm or more stainless steel casing mild steel casing.
Stack cap/spark arrestors.
Control Panel:
a.Temperature Monitoring with 4 digit display.
b.Thermostat control device for burner (fuel saver)
c.Temperature control 0-12 hours.
d.Integral fan timer control
Read More

Supply, Installation and commissioning of Waste Incineration system

De manera atenta solicito me colabore con la cotizacion del incinerador incluyendo envió.Puri group a hospitality business in Indonesia is interested to introduce renewable energy in Indonesia or to use the energy sources for its facility around Indonesia. Kindly request to have more information on incinerator technology as it is needed to process 100 ton to 500 ton waste aday. In the Frame of our Specialized Projects Management, we are currently in search for supplier of Waste Incineration system for hazardous waste, the incineration system will be used for incineration of Prohibited Drugs and toxic materials, waste poultry, Dead Animals “cows, goats”, Spoiled vegetables, Etc. at customs Ports. For that we would like to request for your technical and Financial Proposal for supply , installation and Commissioning of Hazardous Waste Incineration system with incineration capacity of at least 400 Kg/ hr.

Page | 3

The proposal should include the complete description of the whole system: Total cost of supply, Installation, commissioning, Automatic feeding, automatic de- ashing during operation, and efficient gas cleaning system (wet, dry or high temperature ceramic filters), continuous emission monitoring system (CEMS), and all    other    accessories, Control    panel    for    all     components     of     the system, Troubleshooting alarm system covering all components of the system, to notify the operator for the fault that may arise during the operation, and to perform immediate corrective action, Emergency Stop button that can easily shut off / shut down all major part of the system in case of emergency situation. Primary chamber capacity/ Average capacity per patch Load: 3000 Kg, Incineration capacity per hour 400 Kg/hr., Loading system: side loading, Number of burners: minimum 7 burners, (5 for primary chamber, 2 for secondary chamber), Fuel: Diesel, The system should work continuously for at least 12 hours per day, The primary chamber: Heavy- duty anodized Rust resistant steel casing with minimum thickness 7mm. painted with heat reflective paint, internal heavy duty refractory cement lining and insulation for maximum heat retention. Cost of supply, installation, operation cost including fuel consumption per hour, and cost of other consumable materials treatment materials (consumption rate per hour and unit cost each), delivery time till operation, Layout for the whole three units and gas cleaning systems, considering minimum are required for the system “including enough area for operation and handling”, Confirmation letter that gas emission from the system after gas cleaning should comply with Saudi regulations for gas emissions (stamped letter and Emission comparison table showing the emissions from your system compared with Saudi regulations “attached”)

Page | 4

•    Incinerator should have two (2) chambers: primary chamber with five (5) burners to incinerate materials and the secondary chamber with two (2) burners to incinerate exhaust gases.
•    The main body of the incinerator shall be stainless steel and the outside insulation thickness of not less than 7 mm made from zinc or phosphate for temperature insulation
•    The main gate of the Incinerator should be 150 mm thick and strength not less than 170 kg/m3. The door should be automatic with remote to operate.
•    The Incinerator should be designed in accordance of the environmental regulation followed in country of  origin or  as per  Saudi Arabian PME Regulations.
•    The incinerator should have fuel storage with capacity of 1000 liter.
•    The incinerator shall have the capacity to operate with temperature up to 1300 OC in the primary chamber and it can remove the residual while the incinerator is in operation
•    The inside body of the incinerator should have insulation layer made of calcium with thickness of 50 mm while the thickness of the internal surface should be 100 mm in order to stand with 1300 OC.
•    All the supporting braces of the incinerator shall be installed on stainless steel.
•    The gap between the internal and external body shall be filled with the special insulation material.
•    The exhaust shall not stay more than two (2) seconds in the secondary chamber and this chamber shall be built with high density of ceramic oasis.
•    There should be a stack with four (4) meter from the top surface of the incinerator and can be removed and installed.
•    The incinerator shall have control device for exhaust gases so that the emission shall meet the PME source standards
•    The power supply should be 220 – 380 Volts, 60 Hz. and the incinerator shall be provided with control panel showing the following:

Page | 5

•    Temperature of primary and secondary chamber.
•    Condition of pressure gages.
•    Alarm showing if there is any leakage or misconducting in the electricity.
•    Indicator for overloading the burner.
•    Timer for automatically switching off the incinerator.
•    All the incinerator parts including fuel pumps, fans, valves and pipes can be operated in high ambient temperature (50OC)
•    All  parts  of  the  incinerator  shall  be  painted  in  one  color  which  should  be resistant to high humidity, high temperature and high dust / sandstorm.
•    3 years warranty with spare parts and technical supply and
•    10 years warranty for  providing spare  parts starting from the  date  of first warranty expiry
•    Provide all the list of consumable items like, filters, sorbents, etc.

The bidder shall provide all necessary details related to the facility dimensions, space area required for the whole system and all operation requirements, Details about required facility (hanger) including Layout, civil work and electromechanical details including electricity, water pipes, fuel pipes, tanks, etc. Complete Drawing & 3D drawing Clearly Show All Sections and Details of the System. List of spare parts and checklist. Required Operation staff, Fuel consumption rate of the whole system. Since our project is a turnkey project including Design, Build & Operate of central incineration facility covering all the above mentioned details and we have to coordinate all civil works and necessary requirements to operate the system.

Read More

an incinerator for our dental clinics

an incinerator for our dental clinics.The incinerator must comply with ” Technical Standard NTON 05-015-02 Management and Solid Waste Disposal Hazardous co go ” , in addition to meeting international standards functionality standards for new stationary sources and emissions from the Environmental Protection Agency United States ( Environmental Protection Agency EPA ) Incinerators Medical and Hospital infectious waste ( HMIWI its acronym in English ) and the standards of the World Health Organization (WHO ) .

According to point 8.5.1.3 of the NTON 05-015-02 incinerator must have the following:

” Incinerators equipped with a camera primary and a secondary combustion , equipped with burners capable of achieving complete combustion of waste and widespread destruction of harmful and toxic chemicals (dioxins and furans among others) , attached to the solid waste bioinfectious .

a) primary combustion chamber , it requires a temperature of 800 ° C and one hour dwell to be destroyed waste produced ash and gas , including dioxins can generate cancer is found .

b ) In the secondary combustion chamber must reach temperatures around 1,100º C and must be operated with a residence time of the flue gases of a minimum of two seconds. To treat gas flow and entrained particles , before being released into the atmosphere , should be added towers chemical washing , cyclones , filters . ”

The incinerator installed must comply with the design to ensure the destruction of all hazardous , biological , industrial waste and others. Combustion ” PYROLYTIC ” allows control of the gasification of waste and avoid significant release of black smoke and fine powder during loading . It also allows , regular and complete combustion of the waste.

The main advantages are a controlled combustion that guarantees the absence of smoke, color , smell or dust . It is also automatic, so you do not need supervision and has a low fuel consumption .

The incinerator includes:

1. A combustion chamber :
a. watertight door for manual loading of waste.
b . A burner start is limited to inflammation of waste .

2. A camera post-combustion gases :
a. burner combustion , low power .
b . An injection device air for total re- combustion of the gases .

c . An input device cooling air of the combustion gases.
d . A smoke evacuation duct .

3. A control panel ensuring complete combustion cycle .

The incinerator meets as indicated on waste incineration .
They will not burn plastics, packaging except that the amount so small that gases need not receive any treatment, secondary combustion chamber to 1100C handles everything ..

The chimney is 350 mm inner diameter and a height of 8.13m will with hatch analysis.

Combustion chamber

• The combustion chamber is thick steel plate (3 to 10 mm ) with reinforcements, specially built .
• Front loading with watertight door mounted on hinges, locking screw wheel , flexible gasket and an insulating refractory lined .
• An internal lining of refractory concrete containing 42% of H² 03 (alumina ) and 100 mm thick walls.
• fibrous insulation panels made of calcium silicate with a thickness of 75mm .
• Automatic Burner ( diesel or gas must be specified in the order ) with flames diving in one piece monoblock with an electronic ignition system , permanent ventilation control valve and isolation valve.

• combustion floor made in carborundum , preventing binding of glass and slag.

Afterburner gases

• The afterburner is strong sheet steel flange connection.
• Internal filling refractory concrete with very high alumina content ( 65 % H² 03) and a thickness of 150 mm .
• thermal insulation panels made of fibrous silicates and calcium with a thickness of 85 mm .
• diesel or gas burner (must be specified in the order ) , monobloc horizontal flame , electronic ignition , safe , permanent ventilation , control valve and isolation valve.
• air injection nozzles made of refractory steel with a flow control valve.
• These nozzles are specially designed and patented by ATI to guarantee very low hydrocarbon emissions.
• A secondary air injection is scheduled and ensures perfect oxygen content.
• Fan distribution primary and secondary air , the air flow regulation is effected by means of valves and actuators on automatic cycle commands.

Control and regulation
Control Panel dustproof , painted sheet with baked paint comprising:
• A circuit breaker switch for each motor ( fans and burners) .
• A timer adjustable time delay for each burner control .
• A regulator with a digital display for the combustion temperature .
• A controller with digital display for temperature afterburner .
• The electrical panel meets current standard. For removal of ash , a squeegee metal pan with handles

Painting
• Color : Light + dark blue.
• Special high temperature.

OPERATION

The operation thereof is as follows:

• Charging waste.
• Close the door.
• Obtaining the combustion cycle during which no monitoring service ( duration 2 hours ) is required.

The combustion cycle automatically ensures :
• Starting the secondary air fan.

After 10 minutes, the afterburner is temperature:

•Turning on the automatic burner combustion chamber , which guarantees the output of the gasification of waste. The operating time of the burner is programmable according to the type of waste, using an adjustable mechanical timer from 1-60 minutes.
• Automatic start of combustion air fan.

After 2 hours , the end of ” combustion cycle ” automatically guarantee :

• The closure of primary air servomotor .
• The post-combustion burner off.

During charging , opening the door automatically ensures immediate shutdown fan primary and secondary air . At the end of the combustion cycle the fan primary / secondary air and burner continues to run for 2 hours to protect the burners and to cool the oven . After this time the program automatically turns off the installation completely .

FUEL USE

This installation shall take for operation of diesel with the following characteristics :

Density at 15 ° C (max / min ) 0.88 / 0.82 kg / l
Weight sulfur 0.2 % max.
Kinematic viscosity at 40 ° c ( min / max) 2 / 4.5 mm2 / s
Point above 55C inflammation.
Cold filter plugging point -10 ° C max.

DIESEL AND FOOD TANK BURNER

The fuel tank will be located annexed to the dugout roof incinerator in a bund and have the following characteristics :

• Capacity: 1,200 liters
• Made of sheet steel for simple wall installation cubeto
• Output for ventilation diameter 1 ½ ”
• Pressure gauge and filler cap
• Meter and level switch

The incinerator has a consumption of 16.2 liters of diesel hour to burn waste generated operation 10 hours a week expected in two burning , so that autonomy will be 7.5 weeks . The reservoir will have an outlet and an inlet for return. Pipes for oil will drive the black steel pipe with longitudinal electric resistance welded 3/4 ” DN 20mm diameter . In the tank outlet pipe retainer debris filter , with aluminum body is placed , aluminum cup and stainless steel sieve with holes 100 microns in diameter .advise on the consumption rates, is that for both chambers, or per chamber?

Read More

HICLOVER Incinerator YDC model small scale incinerators

Read More