• +86-25-8461 0201

Category: hiclover

The incinerator fuel tank shall meet the following requirements: a) The tank shall be installed above ground and according to all of the fuel tank requirements in Section 1015 including

Anchor all equipment to building floor or structure as shown or as recommended by manufacturer with allowance for thermal expansion as necessary.   Control and Instrument Panel: Rigidly attach enclosure

Test shall be conducted by factory authorized representative of incinerator manufacturer.   Demonstrate required weight reduction of specified waste. Waste shall be fed in a single batch to the unit.

The incinerator shall then take supply from the DO tank through its DO feed pumps to its respective burners. An integrating meter shall be installed to measure the volume of

The successful Bidder shall inform CEB in writing at least three (3) weeks prior to the carrying out of factory tests so as to enable sending of one CEB Engineer

HICLOVER now offer a full range of containerized incineration systems, placing us at the forefront of the latest transportation and industrial trends. Containerization enables immediate waste management as the units are pre-assembled and pre-installed. Containerization is the most feasible and viable option in contrast to the construction of on-site facilities and housing structures, eliminating the man power and costs involved. The system has the added benefit of total mobility (both local and international), and is ideal for military and civil camps and remote locations where infrastructure is scarce. ※ Main Quality:— — — — — Dual Burning Chamber — — Dual Italy Burner – – Burning Cost: 10-100kgs per hr–– – – Burning Chamber: 0.1M3-1.2 M3—

standard type, 11m long ,self supporting Capacity-220kgs/hr refuse-hospital waste average moisture-15-20% on fist time DIMENSIONS height: 2710mm length: 2840mm Width; 2450mm loading door opening: 610mm x 610mm Grate/Heath Area: 2.0(square

A chamber of post combustion of gases * A burner of combustion of gases, * A device of injection of air allowing a total recombustion of gases, * A device

High Temperature Waste Incinerator Model D. MB 750XL Burn Rate-150Kg/hour minimum Weight(Kg)-4000kg Secondary Chamber (double chamber with post-burning) Gas Retention Time 2 second Fuel Diesel Power Supply for control box

Waste Incineration