• +86-25-8461 0201

Category: hiclover

“PYROLYTIC” burning, by managing the gasification of waste The incinerator producer need to remain clear of the launch of black smoke along with excellent dirt, during the loadings. It will

The incinerator shall also be equipped with special loading devices and mechanisms that allow safe incineration of solid waste simultaneously with liquid sludge. Loading of solid waste may be achieved

The incinerator plant shall include a control board for its treatment. On the control panel we will have an aesthetic display of the chamber temperature level levels. This aesthetic screen

1    Basic Plant Design    An approved plant must have four distinct sections that demonstrate three principles of Turbulence, Residence Time and Temperature are inbuilt in the plant design .The regulated

The panel shall comprise of a compartment for the connection of power and control cables. Passage for power cables and control cables shall be made by the bottom part of

Stack size shall be in accordance with the manufacturer’s recommendations. Stacks shall be the forced-air type and   completely self-supporting and unattached to nearby structures. As a minimum, stack heights

the following containerized incinerators. (Kitchen and accommodation and grey water and black water plant removing waste) we need incinerator is each function separate are all in one incinerator we need

Petrol: diesel Consumption: 8-10liter/hour Capacity: to cremate (carrion and spoils) 350-400kg/hour Temperature: 900-1350?C Operation temperature: -30~40?C Incinerator weight: 1800-2000 kg Volume: 0.70-0.80m/cube Exterior dimension: 1.4-1.6*1.0-1.15m (L*W) A heater stands for

waste itself, running problems in the shed chamber (i.e. temperature degree, holding time as well as likewise disturbance) and also motorist capability. Waste having chlorinated materials (i.e. chlorinated solvents and

Waste Incineration