• +86-25-8461 0201

Category: hiclover

As Much As 600kgs per ten-hour day of Kind IV pathological waste or red bag waste ranked at 2200 BTU’s per kg, based upon batch packaging two times daily. Burner,

Incinerator double chamber with capacity 1.5 m3/batch or 6 m3/ day, digital thermocontrol array 0‐1200 C, thermocouple, air supply capacity 10m3/ min, power use 1.2 kWH/ hr, power 3 stage

Heat Waste Incinerator Layout D. MEGABYTES 750XL Melt Rate-150Kg/ hr minimum Weight( Kg) -4000 kg Added Chamber (double chamber with post-burning) Gas Retention Time 2 2nd Gas Diesel Power Supply

c) All manuals must be in English language.   9)  Each of the equipment supplied must be provided with user and technical manuals. Instructions on their usage, storage and service

Burning Capability: 125 kg minimum/time (3-6times/ day), twin chamber, double burning system Assigning door Mouth Size (mm): 760 * 760 (approx.). Smokeshaft External Size (mm): 300 ± 10. Combustion Improver

MINIMUM REQUIREMENTS FOR ENGINE OF INCINERATION CAPACITY OF INCINERATION 30KG / H 1. GENERAL SPECIFICATIONS: The incinerator for medical waste must be designated for the destruction of all types of

Burner Of Burning Capacity 30 kg/hr = 1 No The Incineration System contains: I. Main Heater with A. Refractory lined Key as well as Added Chamber. B. Refractory lined main

i) Patient and operator safety and system performance should not be adversely affected by fluid spills. ii) If the unit is affected, it should fail safely.   c) Overcurrent Protection

Waste Incineration