• +86-25-8461 0201

Category: hiclover

1. SCOPE OF WORK The work specified in the contract will include. 1. Supply, install and commission an incinerator as provided in the technical specifications 2. Provision for adherence to

Waste Incineration HICLOVER Model TS75  Items/Model TS75( PLC) Photo Concept Waste Incineration Burn Rate Average 75 kg/hour Feed Capability Common 150kg Control Establishing PLC( Programmable Thinking Controller Burner) Burning Chamber

1.The double chamber incinerator shall preferably be designed. Air supply in the primary and secondary chamber shall be regulated between 30%-80% and 170%-120% of stoichiometric amount respectively. Flow meter/suitable flow

Mobile Containerized Waste Incinerators pets or human cremation emergency use Layout CA-200 Photo Burning Rate Common 100 kgs/hour Key Burning Chamber 2000 Liters Secondly Burning Smokeshaft Yes Feed Establishing Hand-operated Voltage

Medical waste is currently managed via an old medical waste incinerator; which also manages the associated medical waste delivery and ash removal arrangements.Pathological waste: organs, tissues, surgical specimens, bodily fluids

Waste Incineration