CMC Services for Inclinators for 3 years including all spares, consumables, Skilled Manpower, tools and tackles all complete. As per Scope attached as Annexure Design, Manufacture, Supply, delivery to site, installation, testing & commission of All weather proof Passenger Inclinators in accordance to the Scope and outline specifications mentioned in AnnexureSpesifikasi Incinerator 100kg/jam Spesifikasi dan Daftar Material Dimensi dan Power Capacity Nama Barang : INCINERATOR Type / Model : PWR-INC-KMN 10 Kapasitas : 100kg/Jam (1 m3) Length : 288 cm Width : 147 cm Height : 163 cm Height of Chimney std : 700 cm TOTAL WEIGHT : 8000 kg Panel – timer : Digital Included Auto Alarm Finishing : Hot endured paint Fuel tank : 200 Liter Covering Element from steel : 3-8mm Banyaknya Burner : 2 pcs Banyaknya Blower : 2 pcs Max. Fuel consumption : 15-30 Liter/Jam
Capacity Not less than 500Kg/hr. Operation 24hr-7days/week continuous operation. Combustion chamber 2 combustion chamber. Temp. First combustion chamber 800-1000 C. Secandry combustion chamber 1000-1200 C, with the possibility to be upgraded to 1400 C. Combustion Efficiency 99.99% Retention time Of the flow gases not less than 2 Sec in the hot portion. Excess Oxygen concentration Of primary combustion chamber 3-6% max. Refractory The chambers should be lined with high thermal insulating refractory bricks with suitable thickness and with highly temp. resistance. Not less than 1400 C for the first combustion chamber, and not less than 1600 C for the secandry combustion chamber, and at the same time prevent the Temp. of the outside body of the chamber not higher than 70 C. Doors Should be lined with the same bricks, and the edges lined with special suitable insulating material to prevent any gas escaping, and the doors should be kept under negative pressure during the operation. Air Emission Control System With high destruction and removal efficiency (DRE). Not less than 99.9999 as per KEPA. Wet System If the system equiped with a CEMS washing the flow gas with water, then it should be manufactured from suitable anti corrossion materials, and equiped with pH meter to measure and neutralize the water. It should be able to use the water in closed recycled circuit many times before treating/ discharging into the sewage system in compliance with KEPARS. Chemical dosing It should be equiped with suitable autochemical dosing system to control the pH for the water of the wet scrubber system
Capacity Not less than 500Kg/hr. Operation 24hr-7days/week continuous operation. Combustion chamber 2 combustion chamber. Temp. First combustion chamber 800-1000 C. Secandry combustion chamber 1000-1200 C, with the possibility to be upgraded to 1400 C. Combustion Efficiency 99.99% Retention time Of the flow gases not less than 2 Sec in the hot portion. Excess Oxygen concentration Of primary combustion chamber 3-6% max. Refractory The chambers should be lined with high thermal insulating refractory bricks with suitable thickness and with highly temp. resistance. Not less than 1400 C for the first combustion chamber, and not less than 1600 C for the secandry combustion chamber, and at the same time prevent the Temp. of the outside body of the chamber not higher than 70 C. Doors Should be lined with the same bricks, and the edges lined with special suitable insulating material to prevent any gas escaping, and the doors should be kept under negative pressure during the operation. Air Emission Control System With high destruction and removal efficiency (DRE). Not less than 99.9999 as per KEPA. Wet System If the system equiped with a CEMS washing the flow gas with water, then it should be manufactured from suitable anti corrossion materials, and equiped with pH meter to measure and neutralize the water. It should be able to use the water in closed recycled circuit many times before treating/ discharging into the sewage system in compliance with KEPARS. Chemical dosing It should be equiped with suitable autochemical dosing system to control the pH for the water of the wet scrubber system
1.A chamber of post combustion of gases A burner of combustion of gases, A device of injection of air allowing a total re-combustion of gases, A device of air inlet of cooling of waste gases, A sheath of evacuation of the gases burnt, Carcass in strong sheet steel with support of connection Composition of the refractory; Refractory concrete: Thickness :>150mm Nature: 65%% of Al203 Insulate in fibrous panels: Thickness: >85mm Nature: Calcium Burner with fuel, mono-bloc casting guiding type with horizontal flame, lighting and safety of electronic ignition, permanent ventilation, electromagnetic sluice gate of regulation and isolating valve. A secondary injection of air to ensure perfect oxygen content. 2.A control box ensuring the complete cycle of combustion. 3.Fan: Electro-ventilator distributing the secondary air, the regulation of the air flow being carried out by valves and following the control of the automatic cycle. 4.Controls and regulations: Control box watertight to dust, including: A switch circuit breaker for each engine (ventilators and burners). A timer with adjustable temporization for the regulation of each burner. A regulator with digital watching for the temperature of combustion. A regulator with digital watching for the temperature of post-combustion. Electric box. 5.The de-ashing must be done in the bottom of the combustion chamber or the de-ashing should be automatic or manual batch de-ashing. 6.Process filtering system: scrubber to be mentioned as optional 7.Emission standards compliance: BS 3316 or equivalent standard
1.A chamber of post combustion of gases A burner of combustion of gases, A device of injection of air allowing a total re-combustion of gases, A device of air inlet of cooling of waste gases, A sheath of evacuation of the gases burnt, Carcass in strong sheet steel with support of connection Composition of the refractory; Refractory concrete: Thickness :>150mm Nature: 65%% of Al203 Insulate in fibrous panels: Thickness: >85mm Nature: Calcium Burner with fuel, mono-bloc casting guiding type with horizontal flame, lighting and safety of electronic ignition, permanent ventilation, electromagnetic sluice gate of regulation and isolating valve. A secondary injection of air to ensure perfect oxygen content. 2.A control box ensuring the complete cycle of combustion. 3.Fan: Electro-ventilator distributing the secondary air, the regulation of the air flow being carried out by valves and following the control of the automatic cycle. 4.Controls and regulations: Control box watertight to dust, including: A switch circuit breaker for each engine (ventilators and burners). A timer with adjustable temporization for the regulation of each burner. A regulator with digital watching for the temperature of combustion. A regulator with digital watching for the temperature of post-combustion. Electric box. 5.The de-ashing must be done in the bottom of the combustion chamber or the de-ashing should be automatic or manual batch de-ashing. 6.Process filtering system: scrubber to be mentioned as optional 7.Emission standards compliance: BS 3316 or equivalent standard