• +86-25-8461 0201

Tag: incinerators

Up to 600kgs per ten-hour day of Type IV pathological waste or red bag waste rated at 2200 BTU’s per kg, based on batch loading twice daily. Incinerator, 20 kg/hr 

Flue Gas Cleaning   System   ? Wet Scrubber   ? Electrostatic precipitation in combination ( Optional: Rate to be   quoted separately)     7 Chimney Height 10m (minimum)

Incinerate: medical waste and general waste Capacity to burn waste: 400-500kg/hr Fuel: Diesel Fuel Consumption: 10 liters/hr maximum Incineration temperature: 950-1300 degrees centigrade Casing: thick (min 5mm) stainless steel casing

Medical waste is posing a growing problem all over the world, jeopardizing the health of staff, patients, disposal workers and anyone else coming into contact with the often hazardous materials discarded by hospitals and other healthcare sites. Hospital waste varies from site to site and the biggest challenge is to dispose of this wide range of waste streams. Incineration is still the preferred way to process medical waste without endangering the heath patients, staff or anyone else coming into contact with them. Clinical waste is costing more and more to dispose of safely. Health Clinics and Health center can now handle their own waste streams using one of our specialist medical incinerators. Destroying hazardous waste at source is by far the most effective and efficient way of handling waste that could potentially spread diseases or viruses. Requirement 20% -25% of the full waste created by medical treatment facilities is associated to as hazardous and also might develop a selection of health as well as environmental

HICLOVER now offer a full range of containerized incineration systems, placing us at the forefront of the latest transportation and industrial trends. Containerization enables immediate waste management as the units are pre-assembled and pre-installed. Containerization is the most feasible and viable option in contrast to the construction of on-site facilities and housing structures, eliminating the man power and costs involved. The system has the added benefit of total mobility (both local and international), and is ideal for military and civil camps and remote locations where infrastructure is scarce. ※ Main Quality:— — — — — Dual Burning Chamber — — Dual Italy Burner – – Burning Cost: 10-100kgs per hr–– – – Burning Chamber: 0.1M3-1.2 M3—

SMART ASH INCINERATORS FOR THE DISPOSAL OF HAZARDOUS WASTE ? Quantity: 20 systems ? The Burner collaborates with a 55 gallon open ended up steel drum ? The system operates

Significant incinerators – – – – INDUSTRIAL INCINERATORS – – – specifications listed below. 2.) Measurement requirement for the heaters is 750 — — — — 850 kg ability 3.)

the incinerator can be made use of to do away with Clinical waste IV, used needles, utilized syringes, scalpels, made use of dressing product, private security gadgets like gown, gloves