• +86-25-8461 0201

Tag: hazardous waste

a DUCK farm burner, we require to acquire a tool size incinerator for organic waste, a lot more specific DUCKS.an animal dog crematorium in ireland.Equipment Double chamber medical infectious waste

Intermittent Feed (w/optional loader): .9 yd3/hr (.7 m3/hr) up to 8 hrs/day         Specifications: Length overall -9′-6″ (2896 mm) batch system w/o loader        

?Incinerate minimum 80kg/hr X 12 hrs per day ?Disposal of both non-hazardous and hazardous waste streams (per waste inventory) ?Mobile Unit (Skid mounted preference with lifting points) Design/Specifications ?Incinerators must

HICLOVER, Nanjing Clover Medical Technology Co.,Ltd, supply system solutions for medical environmental protection, animal and pet cremation engineering, other municipal solid waste incineration project. We supply single combustion chamber, double

The secondary combustion chamber must destroy the contaminant product and must resist to high temperature(1100 °C)   Process Filtering system: Scruber to be mentionned as optional Emission Standards Compliance: BS

The incinerator shall then take supply from the DO tank through its DO feed pumps to its respective burners. An integrating meter shall be installed to measure the volume of

SMART ASH INCINERATORS FOR THE DISPOSAL OF HAZARDOUS WASTE ? Quantity: 20 systems ? The Burner collaborates with a 55 gallon open ended up steel drum ? The system operates

Heater for health care facility waste surveillance with the adhering to attributes: – – In high temperatures( pyrolytic burner 2 chambers with temperatures varying from 950 º C to 1320

1    Basic Plant Design    An approved plant must have four distinct sections that demonstrate three principles of Turbulence, Residence Time and Temperature are inbuilt in the plant design .The regulated