Required Specifications for Mobile Incinerator

Operational Capabilities   PROCESS MINIMUM 1 TON PER DAY OPERATED WITH LIMITED TRAINING REGULAR MAINTENANCE CAN BE COMPLETED WITH LIMITED TRAINING COMPLIES WITH EURO / OR US-EPA EMISSION STANDARDS ABILITY TO BURN WASTE LUBRICANTS (POL) HANDLE ORGANIC SOLIDS (TO INCLUDE RMW) DEPLOYABLE MOBILE 24 HRS OF CONTINUOUS USE AUTOMATIC LOADING SYSTEM AUTOMATED ASH REMOVAL SYSTEM

Read More
small capacity incinerators

Capacité destructive de 55 Kg/h jour de déchets hospitaliers  avec un p?.c. i jusqu’à 3.200 Kcal/Kg 1)Type de déchet hospitalier 2)Pouvoir calorifique inférieur                                                                        3.200 kcal/kg 3)Humidité                                                                                                          20% 4)Teneur  en cendres et/ou inertes                                                                       8% 5)Capacité destructive nominale                                                                         55 kg/h 6)Volume chambre de combustion                                                                     1,65 m3 7)Volume chambre postcombustion                                                                   2.1 m3 8)Temps  transit des fumées en post

Read More
CLINICAL BIOLOGICAL WASTE BURNER

It must be a 3 chambered burner The loads ability of 250 kg The realty for the incinerator requirement to be able to stand up to the temperatures and additionally different other useful demands. The smokeshaft should certainly have a solid refractory cellular lining of special type of concrete to stand up to temperature degrees

Read More
waste incinerator manufacturers china

5-1- Chambre de post combustion est installée au dessus du foyer  de combustion , elle  est constituée d’un cylindre  métallique  revêtu intérieurement d’une couche d’ isolant et d’une couche de matériaux réfractaires. 5-2- Volume intérieur?: 2,1 m3 Est dimensionnée pour pouvoir  garantir  un temps de fumée de 2 secondes à 1100°C avec un pourcentage d’oxygène

Read More
incinerators for sale from china

Incinerators used will be limited to daylight hours of operation. This includes shutdown, cleaning and maintenance.   Waste streams shall not be mixed during the incineration process and the ash collection chamber will be cleaned when a different waste stream is to be incinerated. The Company will provide the contractor with a list of items

Read More
medical incinerator primary combustion price

Equipped with main combustion  chamber and a second chamber  for reburning  designed to ensure  complete combustion  of the gases  resulting  from  incomplete  combustion  of inert gases in the chimney, within the standards recommended  by the World Health Organization;   Equipped with temperature controller to adjust the air of the combustion of the waste, and fuel

Read More
animal cremation equipment prices

    The following requirements are to be considered as an integral part of the technical specifications for each equipment type.   The system offered shall be designed to operate normally under the conditions of different regions in Kenya. These conditions may include but not limited to power supply, temperature, humidity, and other climatic conditions.

Read More
medical incinerator design

It is expected that the Bidder will cooperate closely with PATH and target Hospitals for the new waste handling building/area and will make available all needed technical information, drawings, etc.,   The following waste streams shall be treated in the new HCW treatment center(s):   Infectious waste   Sharps waste   Pathological waste   Pharmaceutical

Read More
hospital incinerator manufacturers

SECTION V   TECHNICAL SPECIFICATIONS OF THE INCINERATOR   General Description   The plant must have four distinct sections that demonstrate three principles of turbulence, residence time and temperature retention. The regulated sections may include but not limited to:   Overall plant layout Feed chamber/charging Primary combustion chamber Particulate scrubbers Acid gas The stack/chimney. Minimum

Read More
pet crematorium equipment

Finally, steam to  the jacket should shut off, the unloading door is to be opened Then the shaft and mixing arms are reversed to act as unloading mechanism and should scoop the waste fragments out of the unloading door, onto a conveyor belt or directly into a waste container. The vessel should now be ready

Read More