inciner

inciner

Incinerators QA

Q: what is kind of waste can use in this equipment? A: This equipment for medical waste, pet animal, Municipal waste, live waste. Prohibit any  explosive and radiation material, liquid waste and gas waste. Q: Incinerator Smoke Standard A: China Government Standard: No.GB18484-2001. Q: Treatment capacity A: Average Capacity calculated by medical waste(lower calorific power (L.C.P): 3.0TH Kcal/Kg per hour),  not mean any waste material. The animal/pet combustion rate around 2/3 of average capacity.   Clover incinerator use time per day up to 24 hours. Between each feed/combustion time,  there are about 0.5-1 hours cooling time and time for feeding waste. Actual combustion  time per day is around 16 hours. The lifetime of incinerator between 5-10 year according to use.  Generally, we proposal small laboratory, small clinic use capacity under 20 kgs per hour.  When incinerator use in hospital, please calculate the waste output capacity around 2kgs  per people per day. If there are 200 sickbed in the hospital, that’s mean you need one  incinerator capacity around 400kgs per day, change to capacity per hour is around 30-40 kgs  per hour. According the operation time per day, waste material, budget,  development, etc, you can use capacity from 30-50 kgs per hour incinerator. *How to calculate Animal Cremation Burn Rate: 2/3 of the medical waste. Q: Assembly and Testing A: We supply all documents and incinerators easy to installation and operation. Customer 

inciner

cytotoxic waste

Our interest is for disposing mainly cytotoxic waste, namely out of date or out of specifications cytotoxic pharmaceuticals. Other wastes

inciner

Pet Animal Crematory Incineration

Incineration is the most obvious solution for total destruction of municipal waste, avoiding  all the direct and indirect risks associated with other disposal methods. Incineration perfectly fits into a trend of treating waste in a safe way, and if possible, at the  same place where it was generated to avoid cross-contamination risk and to keep waste treatment costs at acceptable level. ※Main Feature: –Three Combustion Chambers or A/B Primary Combustion Chamber — Double or Three Italy Burner –Burning Rate: 80-800kgs per hour –Combustion Chamber: 1.0M3-10.0M3 ※Optional Function/Parts/Material/Burning Rate:  — Stainless Steel Chimney  — Dry Smoke Filter Chamber — Chimney Height Custom Made — Semi-Automatic Waste Feeding — 3-Section Wet Scrubber System — Movable Platform Feeding Door — Additional Burner — Upgrade/Downgrade Burning Rate WWW.HICLOVER.COM|Waste Incinerators |Auto

inciner

HICLOVER Made Waste Incinerators

HICLOVER, Nanjing Clover Medical Technology Co.,Ltd, supply system solutions for medical environmental protection, animal and pet cremation engineering, other municipal

Waste Incinerator
Scroll to Top