inciner

Supply, Installation and Commissioning of DIESEL FIRED INCINERATORS

Supply, Installation and Commissioning of DIESEL FIRED INCINERATORS Medical Waste Incinerator, 100 to 120 Kg/hr Application   For incineration, general and pathological Capacity    100 C 120 kg/h burn rate Type Two  combustion chambers type; primary  and Secondary, controlled/forced combustion air type with a flue gas emission scrubbing unit Operating time                Minimum 8 hours daily Operating temperature     From 850 0C to 1200 0C, Automatic controlled Residual Ash                    5 to 10% Construction Constructed from heavy duty mild or aluminized  steel Or equal and approved equivalent Insulation material            Refractory material lining similar or equal to calcium  Silicate and hot face combination of heavy duty brickwork

inciner

Supply, Installation and Commissioning of DIESEL FIRED INCINERATORS

Supply, Installation and Commissioning of DIESEL FIRED INCINERATORS Medical Waste Incinerator, 100 to 120 Kg/hr Application   For incineration, general and pathological Capacity    100 C 120 kg/h burn rate Type Two  combustion chambers type; primary  and Secondary, controlled/forced combustion air type with a flue gas emission scrubbing unit Operating time                Minimum 8 hours daily Operating temperature     From 850 0C to 1200 0C, Automatic controlled Residual Ash                    5 to 10% Construction Constructed from heavy duty mild or aluminized  steel Or equal and approved equivalent Insulation material            Refractory material lining similar or equal to calcium  Silicate and hot face combination of heavy duty brickwork

inciner

INCINERATOR SPECIFICATION Capacity UPTO 20 kg/hr

Size:  940 x860x2700 mm Material:  STAINLESS STEEL STACK, REFRACTORY CONCRETE LINING SPECIAL INSULATION MATERIAL With burner:  15 C 20 KW Temperature:   PRIMARY CHAMBER = 800°C AND SECONDARY CHAMBER = 850 – 1200° C Sufficient heat generation for secure and complete combustion 600-800 °C in the first chamber and >1000 °C in the second chamber Easy transportation on standard EURO-pallets Constructed in a modular fashion  easy on-site movement and assembly with a minimum of equipment and technical skills; For the destruction of problematic waste like sharps, amputates and body parts, wet or moist matter; Off-gas quality: moderate smoke emissions during one quarter of the total incineration time; no visible emission during three quarters. AS PER INTERNATIONAL STANDARDS  The remaining ash approximately 5-10% in weight and below 1% in volume of the original waste AS PER INTERNATIONAL STANDARDS  Chimney height at least 5 m above the incinerator 5m ABOVE FROM THE GROUND

Waste Incinerator
Scroll to Top