The successful bidder shall deliver the incinerator skid in a container. The container will be emptied by CEB and
returned to the successful bidder / or to its shipping agent. A containerized solution is also acceptable.
incinerator with a closed air environment , <98%
waste , but not to the degree that leads to the formation of a cluster similar to those resulting
2.9 Interfacing with existing Sludge System
– Incineration of industrial wastes, including pesticides and PCBs;
– Ability to incineration 300-500 kg / hour.
– Complete unit with gas washing system.
The incinerator will be connected to the existing sludge handling system. The incinerator sludge tank will be filled
with sludge by means of a sludge circulating pump on the existing system. The sludge tank shall be equipped with
control valves that will open and close according to the level in the sludge tank.
For the DO tank, its filling line will be connected to the nearest DO supply piping. The DO tank shall be equipped with
a control valve for automatic filling of the tank and level switches that will trigger automatic opening / closing.
2.10 Supervision of Installation, Testing & Commissioning
The successful bidder shall also supply its rates for the supervision of installation and testing and commissioning of
the incinerator set. The rates shall not include accommodation charges. The following shall be covered under the
supervision of installation, testing and commissioning charges;