Would plant operations be operational on a basis of 24 hours per day, 7 days a week, all year long except for
regular and preventive maintenance periods?
valorize urban wastes having a humidity factor of say 50% and a calorific value in the order of 2.5 MW/ton of wastes at
the entrance of the waste-to-energy station (i.e. before pre-treatment of wastes)? What volume and characteristics of
ashes would be produced from such solid wastes valorization?
wastes?
factor could you operate the station at?
some air emissions from the process, how can air emissions be controlled to meet environmental norms?
engineering, engineering for site work, buildings, electrical hook up to existing electrical network? Do you have
complete construction capabilities or would you require a local partner to carry out which portion of construction
work? Would you also operate the station or use a local partner to operate the station?
financing would most likely not be required but this could be the case in other countries where Gestech International
is presently involved in.