medical

health center incinerator provider

As Much As 600kgs per ten-hour day of Kind IV pathological waste or red bag waste ranked at 2200 BTU’s per kg, based upon batch packaging two times daily. Burner, 20 kg/hr Burn Capability (min. 1200 kgs. Waste Feed Ability daily) (4-6 humans resources treatments) (Power Supply 380V, 50Hz, 3Ph). Capability: 30 kg/hr. Number item: 01 system Can you please

Read More
medical

lab incinerator china producer

Incinerator double chamber with capacity 1.5 m3/batch or 6 m3/ day, digital thermocontrol array 0‐1200 C, thermocouple, air supply capacity 10m3/ min, power use 1.2 kWH/ hr, power 3 stage with netral, cooling water sprinkler ability 5L/ minute, finished with refractory (insulation, castable, ceramic covering) and also PLC SUPPLY, INSTALLMENT In Addition To COMMISSIONING OF WASTE HEATER– – TECHNOLOGICAL SPECIFICATIONS

Read More
medical

burner kind of pyrolytic clinical waste burner capacity

Including:Incinerator: Structure to be specified The mark to be specified Water temperature: 800 to 1000 ° C; Refractory Temperature of more than 1100 ° C + obtained; Capacity: 20-50 kg / hour Fireplace: 4 to 6 meters high; Dimension 70 cmx70 crn Height: 1.10 meters Fuel: coal; Aspiration: natural – A receiving cage for biomedical waste; – A combustion chamber

Read More
medical

diesel oil fired medical waste incenerator

Heat Waste Incinerator Layout D. MEGABYTES 750XL Melt Rate-150Kg/ hr minimum Weight( Kg) -4000 kg Added Chamber (double chamber with post-burning) Gas Retention Time 2 2nd Gas Diesel Power Supply for control box 220V-240, solitary phase 50-60Hz Minimum operating temperature degree 1200 oC One year extra parts bundle for full maintainability 10m pipe pipe. 1100 litre fuel Storage tank +pipeline

Read More
medical

garden incinerator

c) All manuals must be in English language.   9)  Each of the equipment supplied must be provided with user and technical manuals. Instructions on their usage, storage and service must be clearly indicated in the manuals and where necessary, on the equipment.   10)Where applicable the following shall apply: a) Electrical Safety i) The unit should be provided with

Read More
medical

maker of ha zardous waste heater in china

Burning Capability: 125 kg minimum/time (3-6times/ day), twin chamber, double burning system Assigning door Mouth Size (mm): 760 * 760 (approx.). Smokeshaft External Size (mm): 300 ± 10. Combustion Improver Tool: 0.11 kw, Fuel intake: 7kg/ hr (max). Re-Burning Tool: Oil intake: 5kg/h, 0.37 kw, Oil usage: 10-20kg/ h. Voltage: 380v/220v Air Conditioning System, Service Guarantee: 1 Year, 50 Hz

Read More
medical

incinerator for medical waste

MINIMUM REQUIREMENTS FOR ENGINE OF INCINERATION CAPACITY OF INCINERATION 30KG / H 1. GENERAL SPECIFICATIONS: The incinerator for medical waste must be designated for the destruction of all types of waste produced by the Center for Health (waste type hospital, clinic, medical laboratory for destructive capacity of 30kg / h) . Pyrolytic gasification combustion control shall: ? Prevent development of

Read More
medical

China incinerator

Burner Of Burning Capacity 30 kg/hr = 1 No The Incineration System contains: I. Main Heater with A. Refractory lined Key as well as Added Chamber. B. Refractory lined main billing door as well as ash cleansing door. II i. 1 No. totally automated oil heating unit for major chamber. III.Centrifugal required draft combustion air follower with electric motor. IV.

Read More
medical

laboratory natural waste incineration

1- There are greater than 4000 Cubic Meter sludge are packed in Plastic Bags & & & & maintained more than ten years 2- Cleaning up and also taken care of 2500 Cubic Meters inside the Oil Tank. – – – – the waste is organic as well as originating from laboratory, can be greatly dangerous in instance of terror

Read More
medical

300 kg incinerator

i) Patient and operator safety and system performance should not be adversely affected by fluid spills. ii) If the unit is affected, it should fail safely.   c) Overcurrent Protection i) Loss of power to other equipment on the same branch circuit due to internal equipment faults should be prevented by using fuses or circuit breakers that are clearly labeled

Read More