medical

Burnaby garbage incinerator operator sued over pollution concerns

The Greater Vancouver Sewerage and Drainage District is suing Maxxam Analytics International Corp. and Covanta Burnaby Renewable Energy ULC for allegedly failing to properly test fly ash samples from the district’s waste-to-energy facility in Burnaby. The district filed a notice of civil claim in BC Supreme Court on October 16. Covanta, according to the claim, operates the incinerator plant under

Read More
medical

Hazardous situation: Incinerators at K-P’s major hospitals out of order

PESHAWAR: Even with clear rules which state hospital waste must be incinerated within 24 hours of its collection, incinerators at two major hospitals in Khyber-Pakhtunkhwa (K-P) are out of order and the waste is dumped outside the hospitals. According to data collected by the Environmental Protection Agency (EPA), 15 to 20 tons of hospital waste is generated daily in the

Read More
medical

Incinerator with Capacity of destruction in weight: 60 Kg/h.

Capacity of destruction in weight: 60 Kg/h. It should be able to operate not less than 10 hours/day This incinerator must be able to destruct all combustible wastes produced by hospitals, private clinics, laboratories, institutes, etc… Design Specification : Types A, B, C, D, and E of medical waste  “PYROLYTIC” combustion, by controlling the gasification of waste. The incinerator must avoid

Read More
medical

negozio tiffany milano the whole of Europe has 423 waste incinerators

Among them,tn, the steel industry produced two? English number is much higher than normal number of waste incineration. � stone hillsIncineration plant turned landscapeIn recent years, with advances in technology, incineration, waste incineration plants living abroad to implement a large-scale restructuring, through higher environmental standards to transform the old incinerator, off a small plant, built manufacturers make incineration plants to

Read More
medical

Adjumani Hospital incinerator blows up

ADJUMANI. The incinerator at Adjumani Hospital, which was built four years ago, has burst due to overheating. For the past four months, support staff at the hospital have been dumping medical waste within the enclosure of the incinerator instead of burning it. The hospital administrator, Mr Michael Ojja, told Daily Monitor on Wednesday that the incinerator broke down due to

Read More
medical

hot medical waste disposing machine, Operation Condition: 8-16 hr/ day

hot medical waste disposing machine, Operation Condition: 8-16 hr/ day  Control: Built-in data recording Operating temperature: Incinerator  /Primary Combustion Chamber Primary Chamber: 900 – 1200 0C Type: continuous loading, Top Loading Capacity/Burn rate per hour: 250 -300 kg/hr  Material: External- 3 layers  Internal lining:  a fire proof material of pre-fired refractory bricks with Aluminium lining, resistant to corrosive waste or gas and to thermal shock Secondary  Combustion  Chamber: Type: horizontal/vertical Temperature:  1200- 1300 oC Residence time of gases : >2 seconds Ash Residue: <5% of original waste size Ash Handling System: Both Automatic and manual removal of Ash. Must ensure removal/treatment of hazardous remnants of ash Flue gas treatment   system : Capable of treating the flow of flue  gas as the incinerator is operating at its maximum capacity Auxiliary device: Water level gauge, pressure sensor, PH sensor..etc  Auxiliary device: Fuel cut-off device Waste  feeding mechanism: Automatic pneumatic/hydraulic waste loading system or conveyor belt , capacity 650-800 L at a time                                                                                                                                       Chimney (Stack): Type: Vertical type height:>7 meter’ Material: Fireproof cast, stainless steel OUTPUT:  GAS- SMOKELESS,ODORLESS  ASH -Max <5% of original waste size Reduction of Pollutant gas SO2, HCL, HF and line particulate Emission standard: WHO/ European Test report for emission testing provided? Heat exchange mode: Automatic Accessories:   All standard accessories for incinerator, including but not limited to loading system, heat exchangers, pollution control system, ash removal system, including ladder and oil tanker (2500litre capacity). Operating Environment:  The incinerator is capable to operate at the altitude of 2400mt above sea level. (according to the site conditions) Power Requirement: 220 Vac single phase or 380 Vac three phase 4 wire system  50HZ    Installation Testing and Commissioning :   to be conducted by certified or qualified personnel.   Supplier shall provide the following documentation     User (Operating) manual in English.  Service (Technical / Maintenance) manual in English.  Certificate of calibration and inspection from factory.  Fast moving spare parts: Supplier is able to provide fast moving spare parts with quantities as described in the price schedule or their equivalent.  Training: Supplier is able to provide training on operation, management and maintenance of incinerators.    Warranty  Comprehensive warranty for minimum 2 year.  Maintenance Service during Warranty Period  During warranty period supplier must ensure, corrective/breakdown maintenance whenever required.  Supplier has a local agent or branch office in Ethiopia (please indicate the name and contact details of the agent)  Supplier provides labor, lifting equipment and tools needed for the installation, testing and commissioning of the incinerator. The supplier will be responsible for the safety of its staff, workers and laborers during the installation, testing & commisssioning  Able to provides all necessary information that would be used as an input for preparation of floor (platform) and room for the incinerator to be supplied such as the following;  Lay outs (drawings) and  pictures of the incinerators to be installed   Length, width and height of incinerator,  Area (length x width) for the floor (platform) and Length, width and height for roofing, for each type of incinerators to be installed  Needs during the transport, installation, assembly, commissioning and operation of the equipment in terms of access points, available space to operate (inside and outside of the room), ways to get to the site where the equipment will be placed or any others. ;  Technical Specifications (fuel consumption rate, weight, anchoring system, support points, etc.);  Chimney specifications to be used for the roof design ( size, support needs, insulation); 

Read More
medical

Bangor’s former incinerator property is not for sale, authority officials say

The Bangor Borough Authority will not sell the former incinerator property. Not right now, at least. The board voted Thursday evening to support authority Chairman Donald Butz’s Oct. 2 letter to borough council President James Kresge that stated the authority need to not sell the incinerator and the surrounding home now identified collectively as the Bangor Company Park. “Too lots

Read More
medical

Bid to burn waste from out of town in Newhaven Incinerator

Veolia is seeking to source non-recyclable commercial and industrial waste for its Newhaven Incinerator from areas neighbouring East Sussex and Brighton and Hove. It argues this will allow the incinerator to produce enough energy to power 25,000 homes continuously. But cllr Rod Main from Newhaven said this would lead to more trucks and pollution. Veolia applied for planning permission to

Read More
Nanjing Clover Medical Technology Co.,Ltd.